Installation of the SW-10 Setworks on LX100 Sawmills
Installation of the SW-10 Setworks on LX100 SawmillsSW-10doc032018 1-1
1
SECTION 1 INSTALLATION OF THE SW-10 SETWORKS ON
LX100 SAWMILLS
IMPORTANT! Before installing and/or operating the
equipment, make sure the sawmill is set up properly.
WARNING! Before performing any service to the sawmill
control box, turn the key switch to the ”0” position, set the
main switch on the control box in the ”0” position and
disconnect the power cord. If you have a DC sawmill,
disconnect the battery cables. Failure to do so may result in
serious personal injury and/or machine damage.