EasyManua.ls Logo

Yardline RIDGEPOINTE - ROOF STRUCTURE ASSEMBLY; RAFTERS ASSEMBLY AND INSTALLATION

Yardline RIDGEPOINTE
78 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
28
You will build SIX assemblies. (5) with two gussets, and (1) with one gusset.
x11
7-1/4 x 18-1/4" (18,4 x 46,4 cm)
x12
2 x 4 x 83-13/16" (5,1 x 10,2 x 212,9 cm)
GPN
OSB OR WOOD GRAIN
TEMPORARY SUPPORT
x1
2 x 4 x 5-1/2" (5,1 x 10,2 x 14 cm)
URB
PARTS REQUIRED:
RAFTERS
FINISH
Your (6) rafters are now assembled.
Flip over rafter assembly and repeat steps 2 - 3 to attach second gusset to other side.
Repeat steps 2 - 4 to build four additional rafter assemblies.
Remove URB.
Secure gusset to rafters with (12) 2" nails as shown.
SET ASIDE ONE RAFTER ASSEMBLY WITH ONLY ONE GUSSET ATTACHED.
4
3
x132
2" (5,1 cm)
Gusset
Flush
Flush
Flush
x2
3" (7,6 cm)
2
BACK
WALL
LEFT
WALL
GPN
Temporary
support URB
GPN
Flush at peak.
Place (2) rafter halves GPN in the corner of back and side wall and URB. Flush rafters at peak.
BEGIN
¸
1
HINT:
Use  oor and walls to
help assemble rafters!
Place URB against left wall at measurement shown.
Secure URB with (2) 3" screws, as shown.

(333,1 cm)




Center
CENTER