39
1
FRONT GABLE UNIT INSTALLATION
PARTS REQUIRED:
FINISH
Your front gable unit is now installed
x4
3" (7,6 cm)
2
Continue nailing lower edge of panels into top plate and doubler with 2" nails spaced 6" apart.
Working inside, secure gable unit with (2) 3" screws screwed into each at an angle .
3
Measure 1-1/2" down from top plate and mark at each side, as shown.
Set gable unit on front wall doubler.
Hold gable unit secure with (1) 2" nail on each side.
BE SURE GABLE IS CENTERED ON WALL BEFORE NAILING.
NAIL FIRST
NAIL FIRST
TOP
PL ATE
DOUBLER
Measure and
Mark
Measure and
Mark
6"
(15,2 cm)
Screws
2" (5,1 cm)
x25
Front
Gable Unit