EasyManua.ls Logo

Yardline RIDGEPOINTE - SOFFIT NAILERS

Yardline RIDGEPOINTE
78 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
41
FINISH
Your (2) gable  llers are now installed
GABLE PEAK FILLERS
x4
3" (7,6 cm)
3/16" (4,8 mm) Drill Bit
HINT:
Pre drill to avoid

HINT:
Pre drill to avoid


Screws

Screws
Install back gable  ller support  ush to back rafter.
Secure with (2) 3" screws angled into rafters.
Install front gable  ller support WAF over  ller panel and  ush to vertical gable connectors.
Check WAF for level.
Secure with (2) 3" screws, as shown.
Install (1)  gable  ller panel  ush to installed gable panel. Center the panel.
Secure with (4) 1-1/2" nails into rafter and (1) 1-1/2" nail into .
Install front  gable  ller panel  ush to installed gable panel. Center the  ller panel.
Secure with (4) 1-1/2" nails into gable ladder frame.
1
BEGIN
3
2
4

Nails

Nails

Outside View
Inside View
WAF


1-1/2" (3,8 cm)
x9
Install gable fi ller panels with the primed side facing outward.
PARTS REQUIRED:
Flush to
panel.
Flush to
panel.
Flush
Flush
Flush
Flush
x2
7-1/4 x 18-1/4" (18,4 x 46,4 cm)
WOOD GRAIN
x1
2 x 3 x 10-5/8" (5,1 x 7,6 x 27 cm)

x1
2 x 3 x 20-1/2" (5,1 x 7,6 x 52,1 cm)
WAF