42
PARTS REQUIRED:


Screws

Screws
Install  overhang boards  ush at peak, primed side down and ush to wall panels .
Secure panels to frame with 1-1/4" screws spaced evenly.
x2
3/8 x 8-1/2 x 76-5/8" (1 x 21,6 x 194,6 cm)

at peak.

Flush to wall.
FRONT OVERHANG SOFFIT
x28
1-1/4" (3,2 cm)
1
BEGIN
FINISH
Your gable overhang sof ts are installed
12-1/2"
(31,8 cm)
Approximately
Install all trim and sof t parts with the primed side facing outward.