43
1-1/4" (3,2 cm)
PARTS REQUIRED:
SOFFIT NAILERS
2" (5,1 cm)
x16
Mark wall at each rafter with a square  ush to bottom side of rafter and side wall .
2
3
BEGIN
1
Repeat steps to install nailers on opposite side.
At the back of the shed, install (2)  sof t  llers  ush to bottom and outside edges of rafter .
Fasten with (2) 1-1/4" screws, as shown. Repeat on opposite side of shed.
Install sof t  ush to sof t and marks.
Fasten at each mark with 2" nails angled into the studs (nail into studs) .
Stud




x2
3/8" x 2" x 5" (1 x 5,1 x 12,7 cm)

TOP VIEW


Screws
Flush
Flush

Mark

Nails



x4
x2
5/8" x 1-1/2" x 96" (1,6 x 3,8 x 243,2 cm) OSB
x2
5/8" x 1-1/2" x 46-3/4" (1,6 x 3,8 x 118,7 cm) OSB
FILLER