EasyManua.ls Logo

Yardline RIDGEPOINTE - Page 46

Yardline RIDGEPOINTE
78 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
44
PARTS REQUIRED:
EAVE SOFFIT
x48
Place and sof t boards primed side down on bottom side of rafter and nailer.
Flush sof t board to front corner of overhang L-block , side wall panels and nailer .
Secure with 1-1/4" screws spaced 12" apart and angled into rafter at seam .
BEGIN
1
Repeat steps to install sof ts on opposite side.
Your eave sof t panels are installed.
FINISH


x2
3/8 x 5-3/16 x 71-1/4" (1 x 13,2 x 181 cm)
x2
3/8 x 5-3/16 x 79-3/4" (1 x 13,2 x 202,6 cm)

Flush to
outside


Screws

(30,5 cm)
SIDE VIEW



Screws
Primed Side
Down


Screws

1-1/4" (3,2 cm)
Flush at
corner
Flush
Install all trim and sof t parts with the primed side facing outward.
HINT:
Pre drill to avoid

3/16" (4,8 mm) Drill Bit