45
2" (5,1 cm)
PARTS REQUIRED:
ROOF PANELS


x4

BLOCK
3/4"
(1,9 cm)

3/4"
(1,9 cm)

Block
Flush at peak

Flush at peak

DOOR
DOOR
x2
7/16 x 48 x 96"
(1,1 x 121,9 x 243,2 cm)
Move to the opposite end.
Using the long edge of the panel as a
lever, move the panel side-to-side until
the top corner is ush to the peak 
and with a 3/4" measurement on the rafter
.
Secure panel with (2) 2" nails
in the corners.
2

Install all roof panels with the rough side facing up (painted grid lines side).
1
BEGIN
Install (1) panel ush to rafter peak
and with a 3/4" measurement on the rafter .
Secure panel with (2) 2" nails in the corners.

in each
corner.

in each
corner.