EasyManua.ls Logo

Yardline RIDGEPOINTE - Page 48

Yardline RIDGEPOINTE
78 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
46
PARTS REQUIRED:
ROOF PANELS
Flush
Flush
 
 

Flush at peak


24"
(61 cm)
24"
(61 cm)
24"
(61 cm)
24"
(61 cm)

Maintain spacing between the center of
the rafters.
Secure with (1) 2" nail into each rafter
.
3
Install (1)  and (1)
 roof panels ush to
installed panel and ush at rafter peak
.
Secure with (2) 2" nails in the corners of
each panel.
4
Flush



Flush

Flush
x1
7/16 x 23-1/4 x 48"
(1,1 x 59,1 x 121,9 cm)
x1
7/16 x 31-3/4 x 48"
(1,1 x 80,6 x 121,9 cm)
5
Move Gable Move Gable
Move to the opposite ends of panels.
Move gables until ush to roof panels
.
Secure panel with 2" nails in the corners.
x11
2" (5,1 cm)
DOOR