EasyManua.ls Logo

York YKHC 18 - Installation Procedures; Installation Site Requirements

York YKHC 18
53 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
29
Part10. Installation
1.
Installation place
 A place where there is enough room for installation and maintenance. (Refer to Chart 1)
 The ceiling is structurally sound to hold the Indoor Unit.
 A place that is well ventilated and the influence of weather is the least.
 A place that the airflow can reach every corners of the room.
 A place where the drain pipe can reach out easily.
 Install the outdoor unit on a rigid base to prevent increasing noise level and vibration.
 Determine the air outlet direction where the discharged air is not blocked.
 In the case that the installation place is exposed to strong wind such as a seaside or high position, secure the
normal fan operation by putting the unit length wise along the wall or using a duct or shield plates.
 Specially in windy area, install the unit to prevent the admission of wind.
Strong
wind
>30cm
>60cm
>30cm
>
2
0
0
c
m
(Wall or obstacle)
Maintain channel
Air outlet
Air inlet
Air inlet
A
C
B

Table of Contents

Related product manuals