EasyManua.ls Logo

York YKHC 18 - Page 33

York YKHC 18
53 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
31
L
10-12
176
34
B. New built houses and ceilings
a. In the case of new built house, the hook can be embedded in advance (refer to the A.b mentioned above).
But it should be strong enough to bear the indoor unit and will not become loose because of concrete shrinking.
b. After installing the body, please fasten the installation paper board onto the air conditioner with bolts
(M5X16) to determine in advance the sizes and positions of the hole opening on ceiling. Please first guarantee the
flatness and horizontal of ceiling when installing it. Refer to the A.a mentioned above for others.
c. Refer to the A.c mentioned above for installation.
d. Remove the installation paper board.

Table of Contents

Related product manuals