EasyManua.ls Logo

Yudo HOT RUNNER - System Reception

Yudo HOT RUNNER
21 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
UH-02-Aug16-ENG P 5 / 21
2.
S
YSTEM
R
ECEPTION
Recommendations
Make sure that the box is received in good condition.
Open box carefully, regard to its position so that parts do not fall with its opening.
Make sure the box content corresponds to the document accompanying the load (packing list).
Visually inspect the system and its components. Check if it is damaged or defective, visually detectable.
If you detect any anomaly relating to previous sections, report immediately to YUDO