45o
45o
PSI
0
1
2
3
4
5
6
7
8
9
10
CLOSE
CLOSE
MOVE INSIDE
45o
45o
OPEN
OPEN
45o
45o
PSI
0
1
2
3
4
5
6
7
8
9
10
CLOSE
CLOSE
MOVE INSIDE
45o
45o
OPEN
OPEN
45o
45o
PSI
0
1
2
3
4
5
6
7
8
9
10
CLOSE
CLOSE
MOVE INSIDE
45o
45o
OPEN
OPEN
45o
45o
PSI
0
1
2
3
4
5
6
7
8
9
10
CLOSE
CLOSE
MOVE INSIDE
45o
45o
OPEN
OPEN
CLOSE
CLOSE
MOVE INSIDE
45o
45o
OPEN
OPEN
45o
45o
PSI
0
1
2
3
4
5
6
7
8
9
10
CLOSE
CLOSE
MOVE INSIDE
45o
45o
OPEN
OPEN
1. Lay out your tent. Peg the 4 corners as
shown
2. Close o the 2 Taps on the right hand side
of the tent
3. Unscrew the cap on the Boston Valve
located on the right hand side of the front
tube. Connect the pump hose. Set up pump
as follows:
- Pump
- Pressure Gauge
- Pressure release Valve
- Hose
4. Inate to 9PSI.
NOTE - During hot weather it is
recommended that 7PSI is used
5. Close isolation taps inside the
tent
45o
45o
PSI
0
1
2
3
4
5
6
7
8
9
10
CLOSE
CLOSE
MOVE INSIDE
45o
45o
OPEN
OPEN
45o
45o
PSI
0
1
2
3
4
5
6
7
8
9
10
CLOSE
CLOSE
MOVE INSIDE
45o
45o
OPEN
OPEN
45o
45o
PSI
0
1
2
3
4
5
6
7
8
9
10
CLOSE
CLOSE
MOVE INSIDE
45o
45o
OPEN
OPEN
45o
45o
PSI
0
1
2
3
4
5
6
7
8
9
10
CLOSE
CLOSE
MOVE INSIDE
45o
45o
OPEN
1. Open the two isolation
valves inside the tent
2. Remove and clean the awning poles. Do not
store poles inside each other
3. Open the two air release taps. These taps
should remain open during the packdown
process
4. Remove and clean all pegs
5. Fold awning over body of tent
6. Fold in 1/3s folding towards
the valves
7. Roll towards the door
45o
45o
PSI
0
1
2
3
4
5
6
7
8
9
10
CLOSE
CLOSE
MOVE INSIDE
45o
45o
OPEN
OPEN
6. Connect the steel awning poles together
- A1 to A2 (x4)
- RA to RB
- R5 to R4
7. Insert the R4 end of the ridge pole into the
rubber locator plug sewn onto the top
centre of the front air beam
8. Insert the spike of the RA / RB pole through
hole at end of R3 and then through eyelet
at end of awning. Extend the RA/RB pole
until the awning roof is level. Extend A5/A4
pole so awning sits taught
9. Insert spikes of A1 / A2 poles through
eyelets on either side of awning and guy
out at 45 degrees
11. Peg out all remaining peg points
R4
45o
45o
PSI
0
1
2
3
4
5
6
7
8
9
10
CLOSE
CLOSE
MOVE INSIDE
45o
45o
OPEN
OPEN
45o
45o
PSI
0
1
2
3
4
5
6
7
8
9
10
CLOSE
CLOSE
MOVE INSIDE
45o
45o
OPEN
OPEN
45o
45o
PSI
0
1
2
3
4
5
6
7
8
9
10
CLOSE
CLOSE
MOVE INSIDE
45o
45o
OPEN
OPEN
R5
RB
RA
A2
A1
JETFORCE
10. Peg out rear vent
45o
45o
PSI
0
1
2
3
4
5
6
7
8
9
10
CLOSE
CLOSE
MOVE INSIDE
45o
45o
OPEN
OPEN
45o
45o
PSI
0
1
2
3
4
5
6
7
8
9
10
CLOSE
CLOSE
MOVE INSIDE
45o
45o
OPEN
OPEN
1
2
3
4