EasyManuals Logo

Zip Line Fun ZL35 User Manual

Default Icon
10 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Page #9 background imageLoading...
Page #9 background image
How to Install Zip Line without Trees
1) Determine if you will need to install post’s on one side of zip line ride or both sides (each
side will require Qty. 2: 6’ x 6’ x 12’ long posts).
2) For each side you will be using post’s instead of trees:
a. Bolt Two 6’ x 6’ x 12’ pressure treated posts one in front of the other.
b. Bury and cement the posts 4-5’ in the ground.
c. Face the skinner side (~5.5” wide) toward the direction the zip line ride will
travel.
3) Wait 24 hours to let the cement dry.
4) Sand down the edges of the posts to make them more rounded where the zip line cable
will wrap around.
5) Use the post like a tree to continue your zip line installation.

Questions and Answers:

Question and Answer IconNeed help?

Do you have a question about the Zip Line Fun ZL35 and is the answer not in the manual?

Zip Line Fun ZL35 Specifications

General IconGeneral
BrandZip Line Fun
ModelZL35
CategorySports & Outdoors
LanguageEnglish