EasyManuals Logo

Zline Monument Series User Manual

Zline Monument Series
67 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Page #14 background imageLoading...
Page #14 background image
CABINET PREPARATION AND WIRE ROUTING
The wiring may enter the opening from either side, the rear, or the floor within the
shaded area.
The electrical connection is on the front right of the dishwasher.
Drill a 1.5 in. maximum diameter hole to run the electrical cable through the wall
of the cabinet.
The hole must be free of sharp edges. If the cabinet wall is metal, the hole edge
must be covered with a bushing or rubber grommet.
Cable direct connections may pass through the same hole as the drain hose and
hot water line, but power cords with plugs must pass through a separate hole.
BEFORE INSTALLATION
9
Electrical Requirements

Questions and Answers:

Question and Answer IconNeed help?

Do you have a question about the Zline Monument Series and is the answer not in the manual?

Zline Monument Series Specifications

General IconGeneral
BrandZline
ModelMonument Series
CategoryDishwasher
LanguageEnglish

Related product manuals