Chapter1InstallationOverview
5.Takeoutthestatic-freebag.
6.Openupthestatic-freebagandtakeouttheelectronicdevice.
–EndofSteps–
1.4.4AcceptanceandHandover
Steps
1.Inspection
Checkthegood'sname,model,numberetcagainstthepackinglist.Verifyeachgoods
accordingtothefollowingitems:
lAnyconcave,convex,scratches,peeling,blistering,blotoutsidethecase.
lAnypaintstripping,scratchesonthecase.
lAnyloosingscrew,dropboltsordislocation.
lAnymissingparts.
Placethegoodsinspectedbycategories.
2.Delivery
Thecustomerrepresentativeandengineeringsupervisorneedtosignonthe
Unpackinginspectionreportaftertheinspection.Ifthecontractspeciesthegoodsbe
keptbythecustomeraftertheinspection,bothpartiesneedtosignontheUnpacking
InspectionReportandtransferthegoodstothecustomer.
–EndofSteps–
1.5InstallationFlow
Figure1-4showstheowchartofinstallingZXSDRR8882,includingPIMDCinstallation,
deviceinstallation,andcabling.
1-7