EasyManua.ls Logo

A.R.I. S-050 - User Manual

A.R.I. S-050
22 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
Loading...
S-050.IOM.ENG02
Installation, Operation & Maintenance
AUTOMATIC AIR RELEASE VALVE
MODEL S-050
The following is a step by step narrated description of the A.R.I. S-050 Automatic Air Release Valve
installation, operation and maintenance processes.
The S-050 Automatic Air Release Valve releases accumulated air from the system while it is under pressure.
Please consult A.R.I. for the pressure and temperature framework of this model specifications table and for
other products designed for hazardous liquids systems.

Questions and Answers

Summary

Disclaimer

Safety Instructions

General Safety Guidelines

Comprehensive safety rules for system designers, installers, operators, and maintenance personnel.

Handling and Personal Safety

Precautions for shipping, handling, lifting, and required personal safety equipment.

Installation

Installation Procedures

Detailed steps for installing the product as per A.R.I. guidelines and manual descriptions.

Commissioning and Initial Operation

Instructions for product startup, operation, and formal commissioning by authorized technicians.

Maintenance Preparations

Steps to take before starting any maintenance or non-regular operation.

Returning to Regular Operation

Installation Recommendations

Installation Configuration Examples

Visual guidance on various installation configurations for the air valve.

Conventions and Measurements

Pipeline and Riser Sizing

Explanation of terms and measurements for pipeline and riser dimensions in installation.

Installation Instructions

System Flushing and Valve Mounting

Specific instructions for flushing the system and mounting the air valve vertically on a riser.

Operation

Automatic Air Release Valve Function

Explains how the S-050 Automatic Air Release Valve releases accumulated air under pressure.

Trouble Shooting

Common Issues and Solutions

Details common problems like broken elbows, spitting water, leaks, and their respective solutions.

Periodic Maintenance

Preparation for Maintenance

Lists required tools and materials for periodic maintenance procedures.

First Stage Maintenance

Steps for addressing small leaks or suspected clogging by cleaning the sealing mechanism.

Second Stage Maintenance

Releasing Pressure for Second Stage

Procedure for safely releasing pressure before commencing second stage maintenance.

Removal of the Air Valve Body (Stage 2)

Steps to remove the air valve body as part of the second stage maintenance process.

Cleaning and Inspecting Components

Detailed procedures for cleaning and inspecting various internal components.

Reassembling the Operating Valve

Steps for correctly reassembling the operating valve after maintenance.

Assembly and Leak Testing

Final steps to reassemble the valve and test for leaks after maintenance.

Assembly BOM Table and Drawing

Component Identification

Bill of Materials and visual breakdown of product components for assembly reference.

A.R.I. Limited Warranty

Warranty Terms and Conditions

Details the warranty terms, conditions, limitations, and exclusions for A.R.I. products.

Summary

Disclaimer

Safety Instructions

General Safety Guidelines

Comprehensive safety rules for system designers, installers, operators, and maintenance personnel.

Handling and Personal Safety

Precautions for shipping, handling, lifting, and required personal safety equipment.

Installation

Installation Procedures

Detailed steps for installing the product as per A.R.I. guidelines and manual descriptions.

Commissioning and Initial Operation

Instructions for product startup, operation, and formal commissioning by authorized technicians.

Maintenance Preparations

Steps to take before starting any maintenance or non-regular operation.

Returning to Regular Operation

Installation Recommendations

Installation Configuration Examples

Visual guidance on various installation configurations for the air valve.

Conventions and Measurements

Pipeline and Riser Sizing

Explanation of terms and measurements for pipeline and riser dimensions in installation.

Installation Instructions

System Flushing and Valve Mounting

Specific instructions for flushing the system and mounting the air valve vertically on a riser.

Operation

Automatic Air Release Valve Function

Explains how the S-050 Automatic Air Release Valve releases accumulated air under pressure.

Trouble Shooting

Common Issues and Solutions

Details common problems like broken elbows, spitting water, leaks, and their respective solutions.

Periodic Maintenance

Preparation for Maintenance

Lists required tools and materials for periodic maintenance procedures.

First Stage Maintenance

Steps for addressing small leaks or suspected clogging by cleaning the sealing mechanism.

Second Stage Maintenance

Releasing Pressure for Second Stage

Procedure for safely releasing pressure before commencing second stage maintenance.

Removal of the Air Valve Body (Stage 2)

Steps to remove the air valve body as part of the second stage maintenance process.

Cleaning and Inspecting Components

Detailed procedures for cleaning and inspecting various internal components.

Reassembling the Operating Valve

Steps for correctly reassembling the operating valve after maintenance.

Assembly and Leak Testing

Final steps to reassemble the valve and test for leaks after maintenance.

Assembly BOM Table and Drawing

Component Identification

Bill of Materials and visual breakdown of product components for assembly reference.

A.R.I. Limited Warranty

Warranty Terms and Conditions

Details the warranty terms, conditions, limitations, and exclusions for A.R.I. products.

A.R.I. S-050 Specifications

General IconGeneral
BrandA.R.I.
ModelS-050
CategoryControl Unit
LanguageEnglish