Commissioning
1
21-46/60
General
The following commissioning instructions are valid for pressure
jet
burners type KBO-
E-R
..
M with a standard delivery ,of individual parts for the burner unit and supply
systems from AALBORG INDUSTRIES.
Prior to commissioning, the instructions for the individual parts
of
the burner unit and
supply systems should be studied. The special instructions for the boiler and control
system should also be consulted. The instructions should only be considered as a
guideline. This
is
due to the fact that each plant should be commissioned individually
to obtain the best burner performance for the
speci~c
plant.
Attention:
If
the
burner
unit
and
supply
systems include
parts,
which
are
not
standard
delivery from
AALBORG
INDUSTRIES, the specific in-
structions
for these
parts
should
be
ignored in the following sections.
The
actual instructions
for
the
specific
parts
should
be
thoroughly
studied
and
followed
during
commissioning.
During commissioning
of
the burner unit and supply systems, it might
be
necessary to
adjust some regulation parameters, timer settings, etc. in the control system to optimise
the function
of
the plant. These adjustments are not described in the following sections,
but should be carried out as the optimisation requirements emerge. Please see the in-
structions for the control system.
1.1
Pre-service checks
Before commissioning
of
the burner, the following work steps must be carried out:
Step
A: Check that the boiler
is
ready for operation according to the special instruc-
tions for the boiler.
Step B: Increase or decrease the water level in the boiler to approximately 50 mm
below normal water level.
Step C: Check the electric wiring.
Step D: Switch on the power for the boiler plant and reset the system
on
the local
panel. Ensure that the burner
is
in
stopped mode.
Step
E:
Check that the control system
is
operational according to the special in-
structions for the control system.
Step
F:
Pre-adjust the set points for boiler operation
on
the pressure switches and/
,or
pressure transmitter.