EasyManua.ls Logo

ABB HT575262 - Page 109

ABB HT575262
138 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
Operation Manual / TPL67-C.. - TPL71-C..
Disassembly and assembly
8
Installing cartridge group
8.7
Page 107
© Copyright 2017 ABB. All rights reserved.
February 2017 HZTL2488_EN Revision D
Measure and note the axial clearance (
A
) (see the section on axial
clearance).
CAUTION
If the axial clearance (A) is out of tolerance, an ABB Turbocharger ser-
vice station must be contacted.
Connect oil pipes and all air lines in accordance with enginebuilder
specifications.
Version with compressor wheel cooling system
Fit the air supply line. (See also chapter entitled Preliminary remarks /
Layout and functionality)
Fit the filter silencer or air suction branch.
Fit the insulation.

Table of Contents

Related product manuals