EasyManua.ls Logo

ABB HT842305 - Page 71

ABB HT842305
134 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
Operation Manual / TPL85-B14/-B15/-B16
Maintenance
5
Cleaning turbine blades and nozzle ring
in operation
5.5
Page 69
© Copyright 2016 ABB. All rights reserved.
May 2016 HZTL2491_EN Revision B
Operating the integrated dry cleaning device
01
Granulate container
(51502)
07
Combined air valve / Pressure-
relief valve (51504)
02
Cover cap (51503) 08
Clamp (51515)
03
Compressed air supply [4 to 10 bar] 09
Pipe elbow (51521)
04
Hose (51512) 10
Heat protection hose (51516)
05
On-Off valve (51505) 11
Screw insert (51514)
06
Ball valve (51513) 12
Cleaning instructions (51517)
CAUTION
The air system must be protected against overpressure (> 10 bar) .

Table of Contents

Related product manuals