39
To order circuit-breaker spare parts/accessories, refer to the
ordering sales codes indicated in the technical catalogue and
always state the following:
type of circuit-breaker
rated voltage of the circuit-breaker
rated normal current of the circuit-breaker
breaking capacity of the circuit-breaker
serial number of the circuit-breaker
rated voltage of any electrical spare parts.
For availability and to order spare parts, please
contact our Service office.
7.1. List of spare parts
Shunt opening release
Additional shunt opening release
Undervoltage release
Time delay device for undervoltage release
Mechanical override for undervoltage release
Shunt closing release
Spring charging geared motor with electrical signalling of
springs charged
Contact signalling geared motor protection circuit-breaker
open/closed
Contact signalling closing springs charged/discharged
Circuit-breaker auxiliary contacts
Locking electromagnet on the operating mechanism
Position contact of the withdrawable truck
Contacts signalling racked-in/isolated
Key lock in open position
Isolation interlock with the door
Protection for opening pushbutton
Protection for closing pushbutton
Locking electromagnet on the withdrawable truck
Set of six tulip contacts
7. Spare parts and accessories
ALL ASSEMBLY OPERATIONS OF SPARE
PARTS/ACCESSORIES MUST BE CARRIED OUT
FOLLOWING THE INSTRUCTIONS ENCLOSED
WITH THE SPARE PARTS, BY ABB PERSONNEL
OR BY SUITABLY QUALIFIED CUSTOMER
PERSONNEL WITH IN-DEPTH KNOWLEDGE OF
THE APPARATUS (ANSI/IEEE C37.04 - C37.54 -
C37.09 - C37.55 STANDARDS, NETA STANDARDS,
NEC NPFA70 STANDARDS) AND ALL THE
STANDARDS AIMED AT CARRYING OUT THESE
INTERVENTIONS IN SAFE CONDITIONS.
SHOULD THE MAINTENANCE BE CARRIED OUT
BY THE CUSTOMERS PERSONNEL,
RESPONSIBILITY FOR THE INTERVENTIONS
REMAINS WITH THE CUSTOMER.
BEFORE CARRYING OUT ANY OPERATION,
ALWAYS MAKE SURE THAT THE CIRCUIT-
BREAKER IS OPEN, THE SPRINGS DISCHARGED
AND NOT SUPPLIED (MEDIUM VOLTAGE CIRCUIT
AND AUXILIARY CIRCUITS).
WARNING

Related product manuals