(5) The evacuation duration depends on the unit’s capacity, generally.
Model Time(min)
FXD-ACD36 30
FXD-ACD60 45
And verify if the pressure gauge at the low pressure side of the manifold valve
assembly reads -0.1MPa, if not, it indicates there is leak somewhere. Then, close
the switch fully and then stop the vacuum pump.
(6) Wait for 10min to see if the system pressure can remain unchanged. During
this time, the reading of the pressure gauge at the low pressure side can not
be larger than 0.005MPa.
(7) Slightly open the liquid valve and let some refrigerant go to the connection
pipe to balance the pressure inside and outside of the connection pipe, so
that air will not come into the connection pipe when removing the hose.
Note that the gas and liquid valve can be opened fully only after the
manifold valve assembly is removed.
(8) Place back the caps of the liquid valve, gas valve and also the service port.
For large-size units, there are maintenance ports for liquid valve and gas valve.
During evacuation, you may connect the two hoses of the branch valve assembly to
the maintenance ports to speed up the evacuation.