ACER
OPERATION MANUAL
Vertical Turret Milling Machine
Model: e-mill 3VS & 3VSII, e-mill 3VK
e-mill 3VKH, e-mill 5VK, e-mill 6VK
w/ Toshiba & Fuji Inverter
Taiwan: Ya-Gin Machine Tool Manufacturing Inc.
No. 101, 506 Lane, Seng-Tso Road,
Seng Karng District, Taichung City, Taiwan
Tel: 886-4-2520-4120 Fax: 886-4-2520-4123
CA: Springwood Industrial, Inc.
2320 E. Valencia Drive
Fullerton, CA 92831
Tel: 714-871-5558 Fax: 714-871-5554
NJ: Klim Industrial, Inc.
244 N. Randolphville Rd.
Piscataway, NJ 08854
Tel: 732-752-9100 Fax: 732-752-9101
Revised: 4/18/19

Table of Contents

Question and Answer IconNeed help?

Do you have a question about the Acer e-mill 3VKH and is the answer not in the manual?

Summary

1. SAFETY INSTRUCTIONS

1-1. General Safety Instructions For Operating The Machine

General safety guidelines for operating the milling machine.

1-3. Installation Precautions

Precautions to ensure safe installation of the machine.

1-4. Safety Precaution

General precautions to ensure operator and equipment safety.

2. SPECIFICATION

4. INSTALLATION

4-1. Lifting Machine

Procedures and guidelines for safely lifting the milling machine.

4-2. Solid Foundation

Requirements for establishing a solid and stable foundation for installation.

4-3. Leveling Machine

Method for accurately leveling the machine using precision levels.

4-5. Connecting Power Supply

Steps for connecting the machine to the plant's power source.

5. LUBRICATION

5-5. Lubrication Schedule for All e-mills

Recommended lubrication schedule and frequency for all e-mill models.

6. OPERATION

7. MAINTENANCE

7-10. Recommended Maintenance Schedule

Scheduled maintenance tasks for daily, weekly, and periodic checks.

Summary

1. SAFETY INSTRUCTIONS

1-1. General Safety Instructions For Operating The Machine

General safety guidelines for operating the milling machine.

1-3. Installation Precautions

Precautions to ensure safe installation of the machine.

1-4. Safety Precaution

General precautions to ensure operator and equipment safety.

2. SPECIFICATION

4. INSTALLATION

4-1. Lifting Machine

Procedures and guidelines for safely lifting the milling machine.

4-2. Solid Foundation

Requirements for establishing a solid and stable foundation for installation.

4-3. Leveling Machine

Method for accurately leveling the machine using precision levels.

4-5. Connecting Power Supply

Steps for connecting the machine to the plant's power source.

5. LUBRICATION

5-5. Lubrication Schedule for All e-mills

Recommended lubrication schedule and frequency for all e-mill models.

6. OPERATION

7. MAINTENANCE

7-10. Recommended Maintenance Schedule

Scheduled maintenance tasks for daily, weekly, and periodic checks.

Acer e-mill 3VKH Specifications

General IconGeneral
CategoryPower Tool
TypeVertical Milling Machine
Z-Axis Travel16"
Spindle TaperR8
Spindle Speed60 - 4200 RPM
Motor Power3 HP
Modele-mill 3VKH