EasyManua.ls Logo

Acorto 2000s - Page 37

Acorto 2000s
237 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
2030-0044
Section
4:
lnstallation
2000sri
Equipped with 4
prong
220 Volt Plug
Lre21
Before
connecting
machine,
check
and veriff
incoming
power
supply. The following
chart displays
the required
voltages.
Receptacle
Voltages
Connections
Voltaqe
L1
to Ground
11OVac
-120Yac
L2 to Ground
1 1OVac
- 120Vac
L1
to
Neutral
1 10Vac
-
120Yac
L2
to
Neutral
11OVac
- 120Vac
L1 to L2
200Vac
-240Yac
Ground to Neutral
OVac.
Install And
Set Jumper Plug
Two
adjusfnents
are required
prior
to
connection
to
power
source. The Jumper Plug
and Step Down
Transformer
must be
properly
connected.
Failure to
properly
set Jumper Plug
and Transformer
Connector
could result
in
MACHINE
MALFUNCTION,
SHORT CIRCUIT,
BLOWN FUSES, OVERHEATING
OR DAMAGE TO CIRCUIT
BOARDS.
Setting
Jumper Plug
1. Measure
Source Voltage at
the
wall
outlet.
Record
in
the
comments section of
the
Installation
Checklist.
2. Remove
electrical
enclosure
cover
to access
DC Power Supply
Board.
3.
CAUTION: ESD protection
required
4.
Remove
the DC Power
Supply
Board
using
the white
ejector
lever.
5.
Insert Jumper Plug
into Jumper Connection
located on
DC Power Supply Board.
Acorto
2000sii
Technical
Support
4-7