PRE-START UP MAINTENANCE (AFTER EXTENDED SHUTDOWN)
- Inspect thoroughly and clean indoor and outdoor units.
- Clean or replace air filters.
- Clean condensate drain line.
- Clean clogged indoor and outdoor coils.
- Check fan imbalance before operation.
- Tighten all wiring connections and panels.
- Check for refrigerant leakage
The design of the outdoor series allows servicing to be carried out readily and easily. The removal of the
top side, front and back panel make almost every part accessible.
CAUTION!
Do not charge OXYGEN, ACETYLENE OR OTHER FLAMMABLE and poisonous gases into
the unit when performing a leakage test or an airtight test. These gases could cause severe
explosion and damage if expose to high temperature and pressure.
It is recommended that only nitrogen or refrigerant be charged when performing the leakage
or airtight test.

Questions and Answers:

Question and Answer IconNeed help?

Do you have a question about the Acson A4LC 40 C and is the answer not in the manual?

Acson A4LC 40 C Specifications

General IconGeneral
BrandAcson
ModelA4LC 40 C
CategoryAir Conditioner
LanguageEnglish

Related product manuals