EasyManua.ls Logo

ACTi D92 - Step 1: Install the Gang Box

ACTi D92
35 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
www.acti.com
Hardware Manual
16
Step 1: Install the Gang Box
Before installation, note that the gang box must be installed with either of the following
orientation:
Screw Holes from Left to Right
Screw Holes from Right to Left
4” Round
4” Octagon
1. Remove a knockout on the gang box to route the network cable.
2. Route the network cable along the surface or inside the surface and into the gang box.
3. Attach the gang box on the surface or inside the surface according to the recommended
orientation above.

Related product manuals