EasyManua.ls Logo

ADC AD-310 - Page 50

ADC AD-310
119 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
46
11. Reverse the procedure for reinstalling the gas valve/manifold assembly to the dryer.
12. Open
ALL gas shut-off valves (closed in Step #2).
13. Reestablish electrical service to the dryer.
a. Test ALL connections for leaks.
IMPORTANT: Test ALL connections for leaks by brushing on a soapy water solution (liquid
detergent works well).
WARNING: NEVER TEST FOR LEAKS WITH A FLAME!!!
14. Operate the dryer through one (1) complete drying cycle to insure proper operation.

Other manuals for ADC AD-310

Related product manuals