EasyManua.ls Logo

ADC Soneplex Broadband System - Page 67

ADC Soneplex Broadband System
342 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
ADCP-61-471 • Issue 4 • June 2000 • Section 2: Operation and Maintenance
2-44
© 2000, ADC Telecommunications, Inc.
DLP-508
Page 1 of 1
–48 VDC POWER SUPPLY TEST
Summary:
This procedure provides instructions for testing the voltage at the power terminal
block located on the Soneplex Broadband chassis backplane. The multimeter should indicate
between
–42.5 VDC and –56.5 VDC.
1. Obtain a multimeter capable of measuring 40 to 60 volts DC.
2. Are fuses installed at the fuse and alarm panel?
If
No
, continue to Step 3.
If
Yes
, continue to Step 4.
3. Install –48 VDC fuses in both A and B fuse holders.
4. Are any of the fuses open or blown?
If
No
, continue to Step 8.
If
Yes
, continue to Step 5.
5. Replace blown fuse or fuses.
6. Did fuse blow again?
If
Yes
, continue to Step 7.
If
No
, continue to Step 8.
7. Clear trouble in the fuse and alarm panel or chassis backplane.
8. Using a multimeter, measure and record the DC voltages. Measure voltage by placing one
probe on the positive contact and the other probe on a solid frame ground. Observe DC
polarity when taking voltage measurements.
Measure the A power feed bus voltage at the fuse holder.
Measure the B power feed bus voltage at the fuse holder.
Measure the voltage across the –48 A and RTN A terminals on the chassis backplane.
Measure the voltage across the –48 B and RTN B terminals on the chassis backplane.
9. Was the voltage measured at all points between –42.5 VDC and –56.5 VDC?
If
Yes
,
Stop! You have completed this procedure
.
If
No
, continue to Step 10.
10. The problem is in the fuse and alarm panel, the power feed cabling, or at the chassis.
Inspect and repair as necessary.
Stop! You have completed this procedure.

Table of Contents