EasyManua.ls Logo

ADD 2004 - 2012 Chevy Colorado/GMC Canyon User Manual

Default Icon
3 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
Page #1 background imageLoading...
Page #1 background image
2004 - 2012 Chevy Colorado/GMC Canyon Front Bumper
Installation Instructions
PREPARATION
1. Disconnect the negative terminal on the battery. Park the vehicle on level ground and set the
emergency brake.
2. We recommend reading through the installation instructions in whole before performing the work.
3. Estimated Installation Time: 2 Hours
4. You will need the following tools:
a. Ratchet
b. Drill
c. 1/2” Drill Bit
d. 3/4” Socket & Wrench
e. Sharpie
Note: this installation requires 2 people for best results
5. Included in Kit:
4 Hex Head Bolts 1/2-20 x 4”
8 Flat Washers 1/2”
4 Metal Lock Nuts 1/2”-20
REMOVAL
1. Remove the clips that hold on the OEM grille. Then, remove the grille by pulling it forward and off the
truck.
2. Remove the four upper mounting bolts that can be seen by looking down from the top of the bumper.
3. Remove the two lower mounting bolts (per side). These bolts can be accessed from underneath the
vehicle and are at each side of the bumper, near the fog lights.
4. Pull the OEM bumper off the truck.
5. Reinstall your grille by pressing it back onto the truck and reinstalling the plastic clips.
6. Prepare to install your new ADD Front Bumper.
INSTALLATION
1. Hold your new ADD Bumper in place on the frame rails, then mark where the mounting holes meet the
frame rails. (Fig A)
Question and Answer IconNeed help?

Do you have a question about the ADD 2004 - 2012 Chevy Colorado/GMC Canyon and is the answer not in the manual?

ADD 2004 - 2012 Chevy Colorado/GMC Canyon Specifications

General IconGeneral
BrandADD
Model2004 - 2012 Chevy Colorado/GMC Canyon
CategoryCar Spares
LanguageEnglish

Summary

Preparation for Bumper Installation

Tools and Equipment Required

Lists essential tools and equipment for installation, including ratchet, drill, drill bits, sockets, and wrench.

Included Kit Components

Details the hardware provided in the kit, specifying quantities of hex head bolts, flat washers, and metal lock nuts.

Removal of OEM Bumper

Installation of ADD Front Bumper

Marking and Drilling Frame Rails

Guide on positioning the bumper and marking the vehicle frame rails for drilling mounting holes.

Initial Bumper Mounting

Instructions for loosely attaching the bumper to the frame using provided bolts, washers, and nuts.

Final Alignment and Torque

Steps to align the bumper correctly and torque the mounting bolts to the specified 70 foot-pounds.

Post-Installation Checks

Recommendation to check and re-tighten all mounting bolts after 100 miles and periodically thereafter.

Related product manuals