[Sentry Trailer – Operation, Startup, and Shutdown Procedures]
Startup and Shutdown Procedures
Startup Procedure
The circuit breakers are in the white battery box located at the rear of the trailer.
Power on the circuit breakers, from top to bottom, in the following order:
1. A1
2. 4S
3. 4B
4. 5B
5. 6B
6. 5S
7. 6S
8. 7S
9. 1B
10. 2B
Shutdown Procedure
Turn off the circuit breakers, from bottom to top, in the reverse order of the startup procedure:
1. 2B
2. 1B
3. 7S
4. 6S
5. 5S
6. 6B
7. 5B
12