Completing charging and disconnecting the
charger
1. 
the charging process.
2. First, remove the plug from the 230V power
socket.
3. 

terminal.
4. 

CHARGING PHASES
The concept of the charging process is explained

Diagnosis


Voltage Function
0 V bis 1.5 V 
1.5 V bis 12 V Charging starts.
12 V bis 13 V Maintenance charging starts.
14.6 V 

>15 V 
Step 1: Condition check
-
lates the required
charging parameters.
8
2
V
A
3 4 5 6 7 9
1
Step 2: Desulphation (rescue)
The charger can rescue most drained batteries
with voltages up to a minimum of 1.5 ±0.5 V.

start charging if the voltage is below 1.5 ± 0.5 V.
At a voltage range of 1.5 ± 0.5 V to 10.5 ± 0.5 V
the charger will initiate pulse charging.
If the voltage rises above 10.5 ± 0.5 V, the charger

charging mode, which will charge faster and more

Step 3: Precharging


Step 4: Soft start

current.
Step 5: Base charge with a constant current

consistent current.
Step 6: Base charge with a constant voltage


Step 7: Analysis

process will stop.
Step 8: Equalisation charge

within 2 minutes, another charging process will

Step 9: Maintenance charging



possible charging level.