11.7.2017 Home Energy Meter Gen5 user guide. : Aeotec by Aeon Labs
https://aeotec.freshdesk.com/support/solutions/articles/6000161943-home-energy-meter-gen5-user-guide- 2/7
Quick start.
The installation of your Home Energy Meter has two major parts: the installation of it into your home’s main circuit box
and the syncing of it to your Z-Wave network. What follows are the instructions for both parts. Please note that only a
licensed electrician, with knowledge and understanding of electrical systems and electrical safety, should perform the
electrical installation of your meter into your home’s circuit box. The syncing of your Home Energy Meter with your Z-
Wave network can be performed by you.
Installing the meter into a circuit box.
Important: Only a licensed electrician should perform these steps.
Important: The circuit box's main breaker should be turned off to perform these installation steps.
The following diagrams highlight how the Home Energy Meter should be installed dependent on the region you are in;
In the United States, it is always a 2-phase installation;
Diagram of USA Version(2 Phases):

Questions and Answers:

Question and Answer IconNeed help?

Do you have a question about the Aeon Aeotec and is the answer not in the manual?

Aeon Aeotec Specifications

General IconGeneral
BrandAeon
ModelAeotec
CategoryMeasuring Instruments
LanguageEnglish

Related product manuals