4.2 Preliminary operations
• Be sure of perfect functionality of all components of the unit.
• Check that unit is provided with installation instructions and with its ordered options.
• Move the unit and its possible optional sections to the installation place as close as possible.
• Do not put tools or weights inside the unit or on the top of it.
• In case of vertical version, unit is anyway delivered as horizontally layed on bench and provided with separate
support feet & assembling kit (washers and M6 bolts,that need 5 mm Allen key); these feet shall be preventively
bolted on the side of the unit as shown in the sequence of figg. 3, 3a and 3b :