EasyManua.ls Logo

AFLOWT UF Series - APPENDIX B. Report on Mounting and Start-Up Procedure

Default Icon
19 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
15
APPENDIX B. Report on mounting and start-up procedure
(recommended)
REPORT
on mounting and start-up procedure
for AFLOWT UF flowmeter, serial No. ________(sheet __ of ____)
UF-5__ d design version, channel No. _____
Beam 1 PEA1.1 No. ______ / PEA1.2 No. _______ ;
Beam 2 PEA2.1 No. ______ / PEA2.2 No. _______ ;
Beam 3 PEA3.1 No. ______ / PEA3.2 No. _______ ;
Beam 4 PEA4.1 No. ______ / PEA4.2 No. _______ ;
1. Site
______________________________________________________________
organization name, postal address, tel/fax
_________________________________________________________________
2. Site characteristics: DN of measuring cut _______ mm;
PEA installation diagram ____________ ; negative flow ________
Type of sounding _________, beam
Table B.1
Type of hydraulic
resistance
Length
of a straight run, m
To PEA1.1, 2.1, 3.1, 4.1
After PEA1.2, 2.2, 3.2, 4.2
3. Parameters of the medium.
3.1. Kind of liquid _____________________________________________
3.2. Temperature of liquid: maximum _________ C
minimum _________ C
average 0.5 (t
max
+ t
min
) = _________ C
3.3. Kinematic viscosity ratio of liquid, = _________ m
2
/s
4. Length of CS-PEA communications cables
Table B.2
Parameter
Parameter value in the channel with PEAs
PEA1.1-
PEA1.2
PEA2.1-
PEA2.2
PEA3.1-
PEA3.2
PEA4.1-
PEA4.2
Length of CS-PEA communications ca-
bles, m