18
Commissioning
EN
WMS-WP6
6 Commissioning
6.1 Commissioning the product
1. Press the "Unlock" pushbutton after you have filled and vented the unit.
- The system is on.
6.2 Function test
The water level does not need to be lowered to test the device.
1. Press the test button.
- The burner switches off.
2. Switch on the product by pressing the unlock pushbutton.