5.2 Mounting the product
1. Mount the product vertically.
2. Before performing welding work, remove the welding sockets from the
probe.
3. Install the product in parallel with a vertical section of the flow line.
4. Install the product in the boiler circuit upstream of the mixer.
- The switch-off level of the product must be at least 100 mm above th
e
h
ighest heated surface of the heat generator.
5.3 Electrical connection
DANGER
ELECTRIC SHOCK
• Verify that the degree of protection against electric shock (protection class,
double insulation) is not reduced by the type of electrical installation.
• Verify that the cover is not exposed to water.
Failure to follow these instructions will result in death or serious injury.
DANGER
ELECTRIC SHOCK CAUSED BY LIVE PARTS
• Disconnect the mains voltage supply before performing the work and ensur
e
th
at it cannot be switched on.
• Verify that no hazards can be caused by electrically conductive objects or
media.