EasyManua.ls Logo

AGA Dual Control Series User Manual

AGA Dual Control Series
32 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
Page #1 background imageLoading...
Page #1 background image
11/15 EINS 516845
PLEASE READ THESE INSTRUCTIONS BEFORE COMMENCING SITE SURVEY
OR INSTALLING THIS APPLIANCE.
REMEMBER: when replacing a part on this appliance, use only spare parts that
you can be assured conform to the safety and performance specification that we
require. Do not use reconditioned or copy parts that have not been clearly
authorised by AGA.
For use in GB and IE
Installation
Guide
AGA DUAL CONTROL
Model No’s: DC3G & DC5G
Question and Answer IconNeed help?

Do you have a question about the AGA Dual Control Series and is the answer not in the manual?

AGA Dual Control Series Specifications

General IconGeneral
BrandAGA
ModelDual Control Series
CategoryOven
LanguageEnglish

Summary

Health, Safety, and Installation Requirements

Competent Engineer Installation

Appliance must be installed by factory-trained engineers following regulations.

Top Plate Adjustment and Power Supply

Power Supply for AGA DC3G

Details electrical supply, connection, and isolation requirements for the DC3G model.

Power Supply for AGA DC5G Hotcupboard

Details independent power supply and connection needs for the DC5G hotcupboard.

Mains Cable Routing and Flue System

Flue System Installation Guidelines

Specifies flue pipe, terminal positions, shielding, and protection requirements.

Hotcupboard Installation and Integration

Gas Pressure Testing and Commissioning

Inlet Pressure Testing Procedure

Procedure to test gas inlet pressure using a manometer and specific test nipples.

Burner Pressure Testing Procedure

Procedure to test burner pressure, similar to inlet testing but using a different nipple.

Pre-Lighting Safety Checks

Ensure correct knob positions, gas supply, and electrical supply are ON before lighting.

Main Burner Lighting Procedure

Step-by-step guide for igniting and stabilizing the main burner flame.

Installation Checklist and User Guidance

AGA Dual Control Installation Checklist

Installer checklist covering hotplate, doors, seals, voltage, vent routing, and burner stability.