EasyManua.ls Logo

Agio 98900L - Installation; Table Base and Top Assembly; Lava Rock Placement; Log Arrangement

Agio 98900L
11 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
5
INSTALLATION
1. With the help of another person, turn the table base assembly in the upright position. With the
help of another person, carefully place the natural stone table top onto the table base. After
making any necessary adjustments to the alignment of the natural stone table top and the top
connector bracket, use bolts and washers as shown in Fig.3. Guide the bolt through the top
connector bracket into the pre-drilled hole on the underside of the natural stone table top. Do
not tighten completely. Repeat on other three holes of the top leg connector bracket.
Figure 3
2. Pour all of the lava rock into the burner pan. Completely cover the burner tube with lava rocks as
shown in Fig. 4
Figure 4
The logs and burner are lettered. Place the logs as shown in Fig. 5 through 9.
Figure
5
. Log A

Related product manuals