01. BRIDGE DECK ACCESSORIES D1 – D10
STAGE 26
FORWARD PART OF
THE SUPERSTRUCTURE
01 02
The accessories
D1–D10 are small.
It is advisable to
work on one or
two at a time:
identify them
from the photos,
then cut them
from the plastic
frame and
smooth any
rough edges.
Check the fit
before applying
the glue.
PB
2602
2603
2601
2604
2605
2606
2601
D6
2601
D1
D9
D7
COMPONENTS CHECKLIST
26-01: Bridge deck
26-02: Bridge accessories
(D1–D10)
26-03: Deck accessories (E1–E4)
26-04: LED holder
26-05: Cable with green light
26-06: Cable label
PB: Two 2 x 5 mm screws
Place the bridge deck 26-01 on your worktop. Cut two
rain hoods (D1 and D6) from the plastic frame 26-02
and fit them to the forward end of the port side, as
shown. Check the fit before gluing in place.
The next two parts fit on the angled side of the
forward end of the bridge deck 26-01. Fit the storage
locker D7 into the front recess, noting the alignment
of the locker. Fit the door D9 into the second recess,
so that the hinges on the door fit into the recesses on
the left-hand side.
19
19
AGORAMODELS BISMARCK
PB
AGORAMODELS BISMARCK