Take the bridge deck assembly from
stage 26 and carefully turn it upside
down. Fit the LED holder 27-03 into
the shaped recess near the front of
part 26-01.
NOTE: The holder is a mirror image
of the LED holder 26-04, fitted in the
previous stage.
Fix the LED holder 27-03 in place with
one PB 2 x 5 mm screw.
03
04
Completed work
Another keel section has been fitted to
the hull. The second navigation light has
been fitted to the bridge deck. The arrow
indicates where the light will appear
later.
2601
2703
2704
2703
PB
25
25
AGORAMODELS BISMARCK
PB
AGORAMODELS BISMARCK