EasyManua.ls Logo

Agora Bismarck - Page 32

Default Icon
42 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
03
04
05 06
With the first guardhouse 29-07 glued in place,
repeat to glue the second guardhouse in place.
Place the bridge deck structure 26-01 on the work
surface. Position the base of the lower mast deck
29-06 on the bridge deck as indicated by the arrow.
Position the lower mast deck structure 29-01 on top
of the lower mast deck base 29-06 as shown.
Holding the three layers together, carefully turn the
assembly over. Fix the three pieces together with four
2 x 5 mm PB screws.
Completed work
The forward section of the
superstructure is gradually taking
shape. The lower mast deck has
been fixed to the bridge deck and
lighting has been fitted inside the
command bridge.
2907
2907
2906
2601
2906
2906
2901
2601
PB
32
32
AGORAMODELS BISMARCK
PB
AGORAMODELS BISMARCK