EasyManua.ls Logo

AirTek TW15 - 16 Drawings; Recommended Installation Drawing

Default Icon
20 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
Pg. -14-
AIRTEK 4087 WALDEN AVENUE, LANCASTER, NY 14086 Tel: (716) 685-4040 Fax: (716) 685-1010
16. A. Sequence of Operation Diagram
RECOMMENDED INSTALLATION
CLEAN DRY, CONTAMINANT FREE AIR
(Note: Desiccant Dryers are designed to remove water VAPOR only)
(Liquid water and oil will damage desiccant)
WARNING: INCORRECT INSTALLATION WILL VOID WARRANTY
- COALESCING PREFILTER W/ AUTO DRAIN MUST BE INSTALLED
- DRYERS ARE DESIGNED FOR 100ºF INLET TEMPERATURE
- DRYER SHOULD BE LOCATED IN AN AREA ACCESSIBLE FOR MAINTENANCE
- AMBIENT TEMP. SHOULD BE BETWEEN 35ºF & 100ºF
- LOCATION SHOULD BE CLEAN, COOL, w/ A LEVEL, VIBRATION FREE FLOOR.
KEY:
AD = AUTOMATIC DRAIN
F = PARTICULATE FILTER
C = COALESCING FILTER
A = ADSORBING FILTER
T = TEMPERATURE INDICATOR
D = DEWPOINT INDICATOR/CONTROLLER
= DIFFERENTIAL PRESSURE INDICATOR
DWG AT718
Rev. C
1/15/92
NOTES:
1.By-Pass Piping should be installed around filters and dryer
for servicing.
2.Differential pressure indicators should be installed on filters
for monitoring of elements
3.Coalescing Prefilter & Particulate Afterfilter are required.
Particulate filter before dryer and adsorber after dryer are
optional.
4.Auto drains must be installed on separator, air receiver,
prefilter & coalescer.
5.Location of receiver may vary depending on particular
conditions & type of compressor. Auto drain required when
receiver is mounted upstream of dryer.
6.Locate coalescing filter as close to dryer as possible.