EasyManua.ls Logo

Akron SABERMASTER 1577 - User Manual

Default Icon
12 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
Loading...
The following is intended to provide the basic instructions for installation, operating and maintenance of the
Electric Ladder Pipe & SaberMaster Nozzle.
TOOLS REQUIRED FOR INSTALLATION OF ELECTRIC LADDER PIPE
• Utility knife • Medium flat screwdriver
• Medium Phillips screwdriver • Small flat screwdriver
• Small Phillips screwdriver
1
2 inch hex head wrench
• Electrician’s pliers (multipurpose,
3
16 Allen Wrench
stripping and crimping)
PRODUCT RATINGS FOR ELECTRIC LADDER PIPE
Maximum motor current draw:
12 volt versions 14.0 amps for elevation motor
3.0 amps for nozzle pattern motor
24 volt versions 7.5 amps for elevation motor
1.5 amps for nozzle pattern motor
Normal operating current (depending on operating conditionspressure, flow, etc.):
12 volt versions 3 - 10 amps for elevation motor
0.7 amps for nozzle pattern motor
24 volt versions 2 - 5 amps for elevation motor
0.4 amps for nozzle pattern motor
Minimum Voltage:
All 12 volt motors: 11.5 volts
All 24 volt motors: 23 volts
Mass: 30 lbs. (13.6 kg)
Maximum Flow: 1000 GPM
Maximum Pressure: 200 PSI
Noise Emission: 93 Db @ 1m with maximum flow
117299 & 119210
STYLE 1494 ELECTRIC LADDER PIPE
& STYLE 1577 SABERMASTER™ NOZZLE
INSTALLATION, OPERATING AND MAINTENANCE INSTRUCTIONS
( Versions Available)
Question and Answer IconNeed help?

Do you have a question about the Akron SABERMASTER 1577 and is the answer not in the manual?

Akron SABERMASTER 1577 Specifications

General IconGeneral
BrandAkron
ModelSABERMASTER 1577
CategoryPlumbing Product
LanguageEnglish