EasyManua.ls Logo

Aladdin ALL200 - Step 5: Attach Second Conduit Connector; Step 6: Secure Temporary Weight

Aladdin ALL200
14 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
STEP 5
Attach the 1/2” conduit connector on ceiling box to bottom of conduit assembly. Once completely inserted,
tighten set screw on conduit connector. See Diagram B. https://youtu.be/JghN8ECvTz4
Never attach or adjust the conduit assembly improperly. is could interfere with the automatic shuto
system and could cause the chandelier to fall, which could cause death, personal injury, and/or property
damage.
1/2” Conduit Connector
STEP 6
Tighten temporary ve pound weight to xture coupler on bottom contact plate. Make sure jam nut on
weight is tight.
Never install or operate an ALL200 before securing the temporary ve pound weight to the xture
coupler. is could cause the temporary weight to fall, which could cause death, personal injury, and/or
property damage.
Diagram B