Unpacking the OAW-AP 
 
This document describes the packaging, AP layout, general process of installation as well as warnings and 
notices that need to be addressed prior to installation. It’s recommended that the entire document be read 
prior to installation. All new AP installations are typically performed in the following sequence:  
 
•  Unpack the AP and check all items in the box. 
•  WLAN Planning. Usually, a comprehensive site survey is required before installation. There are 
many factors to consider such as coverage area, power supply to the AP, location of AP brackets, 
etc. 
•  Install the AP bracket on wall or ceiling. 
•  Install communications outlet (if new outlet is installed) label and test. 
•  Install each AP to bracket. 
•  Connect patch cord to port on AP. 
•  Connect patch cord to outlet. 
•  Verify post-installation connectivity. 
•  Configure each AP. 
 
Access points are radio transmission devices and are subject to governmental regulation. Network 
administrators who are responsible for the configuration and operation of access points must comply 
with local broadcast regulations. Specifically, access point must use channel assignments appropriate to 
the location where the access point will be deployed. 
Package Contents 
2 
Installation Guide 
1 
Pcs 
Mounting Bracket (15/16”) 
 
 
 
Figure1: Product Packing 
 
OAW-AP Installation Guide 
ALCATEL-LUCENT ENTERPRISE    2