EasyManua.ls Logo

Alde Comfort 2928 - User Manual

Alde Comfort 2928
16 pages
Go to English
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
Loading...
Installationsanvisning - Comfort 2928
Instructions for use - Comfort 2928
Betriebsanweisung - Comfort 2928

Other manuals for Alde Comfort 2928

Question and Answer IconNeed help?

Do you have a question about the Alde Comfort 2928 and is the answer not in the manual?

Summary

1. TECHNICAL DATA

2. FITTING THE BOILER

2:1 Mounting a boiler in a cupboard

Details on how to mount the boiler securely within a cupboard, ensuring proper ventilation and clearances.

2:2 Fitting the flue terminal

Instructions for installing the chimney hood, pipe, and sleeve coupling for exhaust and air intake.

2:3 LPG Installation

Guidance on connecting the boiler to an LPG cylinder, including regulator and copper pipe installation.

2:4 Fitting the room thermostat

Instructions for positioning and installing the room thermostat for optimal heating control.

2:5 Electrical installation

Details on the 12-volt electrical connection to the boiler using the terminal block and spade connectors.

3. FITTING THE HEATING SYSTEM

3:1 Connection to the heating system

Details on connecting the LPG boiler with water heater and immersion heater to the heating system.

3:2 Filling the heating system

Instructions for filling the heating system with a 60% water, 40% glycol mixture and bleeding the system.

4. CONNECTION TO HOT WATER HEATER

5. INSTALLATION INSPECTION

LP Gas System Inspection

Checks for the LP gas system, including leak testing, pressure reduction valve, and usage of a leakage tester.

Heating System Inspection

Procedures for testing the heating system for leaks, checking hose clips, and ensuring correct connections.

General Installation Checks

Verification of drainage tubes, circulation pump direction, chimney attachment, and ventilation drum airflow.

Summary

1. TECHNICAL DATA

2. FITTING THE BOILER

2:1 Mounting a boiler in a cupboard

Details on how to mount the boiler securely within a cupboard, ensuring proper ventilation and clearances.

2:2 Fitting the flue terminal

Instructions for installing the chimney hood, pipe, and sleeve coupling for exhaust and air intake.

2:3 LPG Installation

Guidance on connecting the boiler to an LPG cylinder, including regulator and copper pipe installation.

2:4 Fitting the room thermostat

Instructions for positioning and installing the room thermostat for optimal heating control.

2:5 Electrical installation

Details on the 12-volt electrical connection to the boiler using the terminal block and spade connectors.

3. FITTING THE HEATING SYSTEM

3:1 Connection to the heating system

Details on connecting the LPG boiler with water heater and immersion heater to the heating system.

3:2 Filling the heating system

Instructions for filling the heating system with a 60% water, 40% glycol mixture and bleeding the system.

4. CONNECTION TO HOT WATER HEATER

5. INSTALLATION INSPECTION

LP Gas System Inspection

Checks for the LP gas system, including leak testing, pressure reduction valve, and usage of a leakage tester.

Heating System Inspection

Procedures for testing the heating system for leaks, checking hose clips, and ensuring correct connections.

General Installation Checks

Verification of drainage tubes, circulation pump direction, chimney attachment, and ventilation drum airflow.

Alde Comfort 2928 Specifications

General IconGeneral
Voltage12 V DC / 230 V AC
Glycol mixture50%
Power consumption 12 V DC0.2 A
FuelLPG/Propane, Butane
Fuel TypeDiesel

Related product manuals