EasyManua.ls Logo

AllEarth Renewables AllSun Tracker 20 Series User Manual

AllEarth Renewables AllSun Tracker 20 Series
46 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
Page #1 background imageLoading...
Page #1 background image
| 1AllSun Tracker Above Ground Installation Instructions V12
AllEarth Renewables, Inc.
94 Harvest Lane • Williston, VT 05495
Phone 802-872-9600
info@allearthrenewables.com • www.allearthrenewables.com
V12
INSTALLATION MANUAL
Instructions for
AllSun Tracker
Series 20 & Series 24
Question and Answer IconNeed help?

Do you have a question about the AllEarth Renewables AllSun Tracker 20 Series and is the answer not in the manual?

AllEarth Renewables AllSun Tracker 20 Series Specifications

General IconGeneral
BrandAllEarth Renewables
ModelAllSun Tracker 20 Series
CategoryInverter
LanguageEnglish

Summary

Revision Table

Recommended Tools List

Additional Tools

Installation Heavy Equipment Requirements

Ground Work

Specifies requirements for concrete base and helical pile installation.

Above Ground Work

Outlines lifting and handling capabilities needed for components.

Taking Apart the Pallet

Installing the Mast

Helical Pile & Steel Riser Installation

Instructions for installing the mast onto a helical pile or steel riser base.

Precast Base & Custom Pour Base

Preparing the Can Assembly

Installing Provided Inverter

4.2 kW Inverter Installation

Step-by-step guide for installing the 4.2 kW Power-One inverter.

Installing Provided Inverter

6 kW Inverter Installation

Step-by-step guide for installing the 6 kW Power-One inverter.

Preparing the Supplied Inverter

Installing Dealer-Supplied Inverter

Installing the Can Assembly

Frame & Rail Assembly

Assembling Frame Components

Assembling Cylinder Bracket Beam

Instructions for assembling the cylinder bracket beam component.

Assembling Frame

Assembling Rails

Mounting Rails

Rail Assembly Layout

Mounting Trim

Installing Frame & Rail Assembly On To Mast Assembly

Installing PV Modules

Installing PV Modules

Installing PV Modules

Wiring Array

Installing Anemometer

Installing DC Guard

Load Center Installation: 240/208V Sites

Load Center Installation: 277V Sites

Power Up

Calibration

Beep Codes

Explains audible signals from the controller for status indication.

Installing AllSun Plaque

Related product manuals