Do you have a question about the Allied BCE5E Series and is the answer not in the manual?
Describes installing the air handler in a closet with a false bottom or under-unit plenum, specifying louver requirements.
Details supporting the unit on the bottom, removing the horizontal drain pan, and connecting plenums for upflow.
Covers general requirements for horizontal installations, including support and access.
Outlines the field modifications required for left-hand horizontal air discharge.
Explains connecting primary and secondary drain lines, including trap requirements and sealing.
Details how to slope the unit to ensure complete drain pan emptying.
Describes the procedure to test the drain pan and lines for leaks and proper drainage.
Specifies sizing, insulation, and plenum extension requirements for supply and return ducts.
Lists filter sizes for different unit models and notes on high-efficiency filters.
Explains how to select speed taps for different tonnage matches and applications.
Lists essential checks before powering up the system for initial operation.
Procedure to verify the indoor blower operates correctly.
Steps to confirm cooling and heating cycles, and system response to thermostat changes.
Describes the sequence of events when the thermostat calls for cooling.
Explains the operation sequence for electric heat.
Details the operation sequence for heat pump heating.
Covers the process for engaging emergency heat mode.
Provides instructions for fixing or replacing damaged cabinet insulation to maintain thermal performance.
Describes installing the air handler in a closet with a false bottom or under-unit plenum, specifying louver requirements.
Details supporting the unit on the bottom, removing the horizontal drain pan, and connecting plenums for upflow.
Covers general requirements for horizontal installations, including support and access.
Outlines the field modifications required for left-hand horizontal air discharge.
Explains connecting primary and secondary drain lines, including trap requirements and sealing.
Details how to slope the unit to ensure complete drain pan emptying.
Describes the procedure to test the drain pan and lines for leaks and proper drainage.
Specifies sizing, insulation, and plenum extension requirements for supply and return ducts.
Lists filter sizes for different unit models and notes on high-efficiency filters.
Explains how to select speed taps for different tonnage matches and applications.
Lists essential checks before powering up the system for initial operation.
Procedure to verify the indoor blower operates correctly.
Steps to confirm cooling and heating cycles, and system response to thermostat changes.
Describes the sequence of events when the thermostat calls for cooling.
Explains the operation sequence for electric heat.
Details the operation sequence for heat pump heating.
Covers the process for engaging emergency heat mode.
Provides instructions for fixing or replacing damaged cabinet insulation to maintain thermal performance.