EasyManua.ls Logo

Alstom FKG1X - Page 121

Alstom FKG1X
274 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
InstallationInstallation
Assembly of thAssembly of th
e circuit be circuit b
reaker on-reaker on-
--
sitesite
G31--201EN12G31--201EN12
4/204/20
04--201104--2011
© ALSTOM 2010. All rights reserved. Informat© ALSTOM 2010. All rights reserved. Informat
ion contained in ion contained in
this document is indicative only. No this document is indicative only. No
representatirepresentati
on or on or
warrantwarrant
y is y is
given or should given or should
bebe
relied on that it is complete or correct or will apply to any particular project. This will depend on the technical and commercial circumstances. It isrelied on that it is complete or correct or will apply to any particular project. This will depend on the technical and commercial circumstances. It is
provided without liabiliprovided without liabili
ty and ty and
is subject to is subject to
change without notice. Reproduction, use or disclosure to change without notice. Reproduction, use or disclosure to
third parties, without express writtthird parties, without express writt
en authority, isen authority, is
strictly prohibited.strictly prohibited.
GRID GRID
Installing the lifting toolInstalling the lifting tool
Initial RequirementsInitial Requirements
NEVNEV
ERER
HANHAN
DLEDLE
OROR
SLINSLIN
G G
THETHE
CIRCIR
CUIT CUIT
BREBRE
AKEAKE
RR
OR OR
POLPOL
ESES
FROFRO
MM
UNDER THE SHEATHES.UNDER THE SHEATHES.
ALWAYS USE THE SLINGING/LIFTING POINTS BELOW.ALWAYS USE THE SLINGING/LIFTING POINTS BELOW.
HandlingHandling
Installing Installing
the the
lifting lifting
tooltool
x x
44
Site attaching toolSite attaching tool
CAUTION!CAUTION!
Adjust the Adjust the
bal-bal-
anceance

Related product manuals