EasyManua.ls Logo

Alstom FKG1X - Page 212

Alstom FKG1X
274 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
Maintenance
Maintena
nce
plan
G51
-
-0
01EN07
15/18
02--2011
© ALSTOM 2010. All rights reserved. Informat
ion contained in
this document is indicative only. No
representati
on or
warrant
y is
given or should
be
relied on that it is complete or correct or will apply to any particular project. This will depend on the technical and commercial circumstances. It is
provided without liabili
ty and
is subject to
change without notice. Reproduction, use or disclosure to
third parties, without express writt
en authority, is
strictly prohibited.
GRID
Detail of ci
rcuit
-
-
breaker maintenance operations
, continued
Changing
the FK3
-
-12
When carryin
g out the
10,000 cycle servi
cing the circuit breaker’s FK3-
-12
op
er
ati
ng
mec
ha
ni
sm
sh
ou
ld
be
ch
an
ge
d.
Thi
s
op
er
ati
on
mu
st
be
ca
rri
ed
ou
t
by
ALS
TOM
Grid S.A.
,
Cus
tom
er
Ser
vic
es
,
who
sho
uld
be
con
tacte
d
prio
r
to all interventions of this type during the planning phase.
Changing
the
connect
or
Rod assembly
When carrying out the
10,000 cycle servicing the
circuit breaker’s connector
rod assembly should also be changed.
This operation must be carried out by
ALSTOM Grid S.A., Customer Ser-
vices
, who should be contacted prior to all interventions of this type during
the
plann
ing phase.
Replac
ement of
bea-
ring
motor-
-driven
fans
(if
applica
ble)
In case of anomaly in the state of the bearing of the motor--driven fans, con-
tact:
ALSTOM Grid S.A., Customer Service
, in order to envisage changing the
deteriora
ted
parts.

Related product manuals